Gannawarra Planning Scheme — Amendment Tracker
A planning scheme amendment is a formal change to a council's planning scheme, the legal document that controls land use and development in its area. Amendments can rezone land, introduce or vary overlays, or update local planning policy, and each one is gazetted by the Victorian Government before it takes legal effect. PolicyPing checks the Gannawarra Planning Scheme daily and records every change below.
View the official Gannawarra Planning Scheme on Planning Victoria →
Recent amendments
We detected a change to Gannawarra's planning scheme (VC323): for full accuracy, we're showing the amendment's own official government description directly: "Amend clause 59.05 (Building and works in an overlay) to enable a VicSmart application for land within an EMO to be accompanied by the information specified in the EMO, including information specified in a schedule to the EMO.", this is the amendment's own official wording, not a PolicyPing-generated description of the scheme text.
In Clause 32.05-6, the phrase "if the development meets the following standards of Clause 54: Clause 54⏎ clause 54.02-1 Street setback." was added, clarifying the standards for constructing or extending a dwelling on a lot less than 300 square metres.
The Gannawarra Planning Scheme was updated with amendment VC313, resulting in several changes to Clause 14.03.
In the Gannawarra Planning Scheme, the date for Clause 45.12 was changed from 21 March 2025 to 4 September 2026, and a new schedule, SCO3 for the Goschen Rare Earths and Mineral Sands Project Incorporated Document, July 2026, was added.
The amendment changed the date reference from 5 May 2026 to 16 June 2026 for VC312.