Campaspe Planning Scheme — Amendment Tracker

Status: Actively monitored Last updated 2 October 2026 Current amendment: VC323 Region: Northern Victoria

A planning scheme amendment is a formal change to a council's planning scheme, the legal document that controls land use and development in its area. Amendments can rezone land, introduce or vary overlays, or update local planning policy, and each one is gazetted by the Victorian Government before it takes legal effect. PolicyPing checks the Campaspe Planning Scheme daily and records every change below.

Get alerted when the Campaspe scheme changes See pricing

View the official Campaspe Planning Scheme on Planning Victoria →

Recent amendments

VC323 2 October 2026
Verified sourceThis update is shown using the amendment's own official record or its exact wording, rather than a PolicyPing-generated summary — verified directly from source.

We detected a change to Campaspe's planning scheme (VC323): for full accuracy, we're showing the amendment's own official government description directly: "Amend clause 59.05 (Building and works in an overlay) to enable a VicSmart application for land within an EMO to be accompanied by the information specified in the EMO, including information specified in a schedule to the EMO.", this is the amendment's own official wording, not a PolicyPing-generated description of the scheme text.

VC315 24 September 2026
MajorA substantial change to this provision. Automated assessment, not an official government classification.

In Clause 32.05-6, the text was modified to clarify that a dwelling can be constructed or extended on a lot less than 300 square metres if it meets specific standards of Clause 54, with a clearer reference to Clause 54.02-1 Street setback.

VC313 18 September 2026
FormattingMinimal or no visible legal effect — formatting or housekeeping only. Automated assessment, not an official government classification.

In the Campaspe Planning Scheme, Clause 14.03 was updated to replace references to "natural resources" with "earth and energy resources." The clause now includes new provisions to identify and protect extractive industry and extractive resources within Strategic Extractive Resource Areas and Extractive Industry Interest Areas, as well as to facilitate the use and development of extractive industry and compatible land uses within those areas.

GC151 22 October 2021
MajorA substantial change to this provision. Automated assessment, not an official government classification.

Campaspe's planning scheme was amended by GC151: Planning Vic's own gazettal document manifest confirms this amendment changed planning scheme maps only, with no ordinance or schedule text amended, so there is no clause-level wording for PolicyPing to compare; the amendment's own official government description reads: "The Amendment expands the geographic extent of the Floodway Overlay and Land Subject to Inundation Overlay to include all land subject to the Upper Deakin, Cornella Creek Catchment and Guilfus Congupna Drainage Course Declarations declared under Section 218 of the Water Act 1989 in the Campaspe and Greater Shepparton Planning Schemes.", this is the amendment's own official wording, not a PolicyPing-generated description of the scheme text.

C122camp 5 December 2024
MajorA substantial change to this provision. Automated assessment, not an official government classification.

Campaspe's planning scheme was amended by C122camp: Planning Vic's own gazettal document manifest confirms this amendment changed planning scheme maps only, with no ordinance or schedule text amended, so there is no clause-level wording for PolicyPing to compare; the amendment's own official government description reads: "Rezone a surplus school site from Public Use Zone 2 Education (PUZ2) to General Residential Zone (GRZ) and apply the Environmental Audit Overlay (EAO)", this is the amendment's own official wording, not a PolicyPing-generated description of the scheme text.

C112camp 4 July 2019
MajorA substantial change to this provision. Automated assessment, not an official government classification.

Campaspe's planning scheme was amended by C112camp: Planning Vic's own gazettal document manifest confirms this amendment changed planning scheme maps only, with no ordinance or schedule text amended, so there is no clause-level wording for PolicyPing to compare; the amendment's own official government description reads: "The amendment rezones surplus government land known as Lot 1 on LP76472 in Echuca from Public Use Zone 4 (PUZ4) to Industrial 1 Zone (IN1Z) and applies the Design and Development Overlay – Schedule 7 (DDO7).", this is the amendment's own official wording, not a PolicyPing-generated description of the scheme text.

VC312 16 June 2026
NotableA moderate change likely to affect how this provision applies. Automated assessment, not an official government classification.

The amendment changed the date of the table of uses from 12/05/2026 VC309 to 16/06/2026 VC312.