Victorian Planning Scheme Amendments (VC)
VC amendments change the Victoria Planning Provisions, which apply across Victorian planning schemes. Amendments with their own page show the official description. Other amendments show the number and gazettal date, and the most recent also link to the official record where verified. To see amendments for a single council, browse planning schemes by council.
What is a VC amendment? | VC amendments by month gazetted
Get the next VC amendment in your inbox
One email when a VC amendment is gazetted, plus a short weekly summary. No account needed. Unsubscribe any time.
Amendment VC322 makes changes to the Victoria Planning Provisions and all planning schemes by amending the Planning Policy Framework and rural zones to better protect Melbourne's green wedge land and Victoria's...
Amendment VC305 makes changes to the Victoria Planning Provisions (VPP) and all planning schemes by introducing a new clause 45.13 (Live Music Overlay) and updating live music provisions to support the ongoing operation...
Amendment VC319 makes changes to the Victoria Planning Provisions and 79 planning schemes to increase the number of dwellings that can be constructed under the VicSmart planning assessment pathway from two to four in...
Amendment VC317 makes changes to the Victoria Planning Provisions and all planning schemes to implement flood reforms by updating policy and introducing new flood planning controls for a risk-based rating system
Amendment VC306 makes changes to the Victoria Planning Provisions and all planning schemes to better facilitate the development of small second dwellings and movable units.
Amendment VC310 makes changes to the Bass Coast planning scheme to give effect to the Bass Coast Statement of Planning Policy (Bass Coast SPP) and amends the Victoria Planning Provisions and all planning schemes to...
Amend clause 59.05 (Building and works in an overlay) to enable a VicSmart application for land within an EMO to be accompanied by the information specified in the EMO, including information specified in a schedule to...
Amendment VC315 makes changes to the Victoria Planning Provisions and all planning schemes to introduce a series of refinements to the residential development requirements at Clauses 54, 55 and 57 to improve clarity...
Amendment VC313 updates the Victoria Planning Provisions and all planning schemes by amending clause 14.03-1S (Resource exploration and extraction) to strengthen support for extractive industry within areas such as...
Amendment VC311 amends clause 45.09 (Parking Overlay) to align with the changes made to clause 52.06 (Car parking) by Amendment VC277 in December 2025 as part of the car parking reforms.
The amendment clarifies that hemp brick production is included as a rural industry and requires a planning permit to produce hemp bricks in rural zones.
The amendment improves bushfire planning by updating terminology and measures, increasing and clarifying planning permit exemptions for dwellings and other buildings, and updating decision guidelines that apply to the...
The Amendment changes the VPP and all planning schemes in Victoria by correcting and updating references to government departments, statutory authorities and ministerial portfolios in local provisions following...
The Victoria Planning Provisions and all planning schemes are amended to increase the estimated cost of development thresholds for classes of VicSmart application to account for increased building construction costs in...
Amendment VC308 changes the VPP and all planning schemes in Victoria to update all schedules to the Mixed Use Zone, Township Zone and Residential Growth Zone to align with the operation of the Mid-Rise Code introduced...
Amendment VC300 changes the VPP and all planning schemes in Victoria by implementing the Mid-Rise Code to introduce new deemed to comply assessment provisions for four to six storey residential development in...
Amendment VC245 makes changes to give effect to the Surf Coast Statement of Planning Policy (SPP) and Bellarine Peninsula SPP.
The amendment supports the provision of energy-related infrastructure by facilitating the creation of new smaller lots for utility installations that transmit, distribute or store electricity in the Farming Zone and...
The Amendment changes the VPP and 10 planning schemes in Victoria by updating clause 43.06 (Built Form Overlay) to improve clarity, simplify complexity and support preferred built form outcomes.
Amendment VC278 applies Significant Landscape Overlays (SLOs) to 17 waterways within the Yarra (Birrarung) and Waterways of the West catchments.
Amendment VC277 amends car parking requirements to align car parking rates with demand and reduce the number of car parks required in locations well-serviced by public transport.
Amendment VC301 corrects Clause 52.37 table of permit exemptions to ensure public authorities and municipal councils do not require a permit to remove, destroy or lop a canopy tree to construct or maintain the transport...
Amendment VC297 creates an efficient approvals pathway for permits to facilitate the assessment of minor projects to support the delivery of the broader Suburban Rail Loop Authority transport program, including Suburban...
The amendment changes the VPP and all planning schemes to align the provisions with the new name for Major Road Projects Victoria (MRPV) to VIDA Roads.
Amendment VC291 updates the Victoria Planning Provisions and all planning schemes to replace the Guidelines for the removal, destruction or lopping of native vegetation, 2017 with the version published in 2025 and amend...
Amendment VC294 reforms sign provisions to exempt specified signs from planning permit requirements and remove mandatory permit expiration dates for most signs.
Amendment VC296 reinstates the operation of the existing coronavirus (COVID-19) pandemic and recovery exemption planning provisions until 30 June 2027.
The amendment extends the streamlined VicSmart assessment process to include planning permit applications for the construction of two dwellings on a lot and the subdivision of land into two lots.
Amendment VC289 introduces a planning permit requirement to remove, destroy or lop a canopy tree in residential areas at clause 52.37 (Canopy trees) into the Victoria Planning Provisions (VPP) and all planning schemes.
Amendment VC292 makes changes to the Victoria Planning Provisions (VPP) and all planning schemes to include reference to the Neighbourhood Character Overlay (NCO) in the 'Application' section of clause 54 that was...
Amendment VC268 is required to give effect to the Victorian Transmission Plan and update strategies to facilitate renewable energy development in declared renewable energy zones.
The Amendment changes the Victoria Planning Provisions and all planning schemes in Victoria to implement Plan for Victoria (Department of Transport and Planning, 2025), update and introduce policy, remove reference to...
The amendment makes changes to the land use definition of Minor utility installation in the Victoria Planning Provisions and all planning schemes to ensure the appropriate planning assessment of large battery storage...
The Amendment changes the VPP and 63 planning schemes in Victoria by making Abattoir a section 1 use in the Table of Uses where specified siting, design and amenity conditions are met in clause 35.04 Green Wedge Zone...
The amendment changes the Victoria Planning Provisions and all planning schemes in Victoria by introducing a new clause 54 (One dwelling on a lot or a small second dwelling on a lot), making consequential changes to...
The amendment improves the operation of the existing Development Facilitation Program (DFP) planning provisions at clauses 53.22 and 53.23 and expands the program eligibility to include gas projects and saleyards.
The amendment changes the VPP, Melbourne and Yarra planning schemes by implementing the recommendations of the World Heritage Environs Area Strategy Plan: Royal Exhibition Building and Carlton Gardens (Department of...
Amendment VC281 makes changes to the Victoria Planning Provisions and 34 planning schemes by amending clause 12.03-1R (Yarra River protection) to implement stage one of Burndap Birrarung burndap umarkoo, the Yarra...
Amendment VC280 introduces the Great Design Fast Track into the Victoria Planning Provisions and all planning schemes in Victoria.
Amendment VC276 makes changes to the Victoria Planning Provisions (VPP) and all planning schemes to amend all residential zone schedules and Neighbourhood Character Overlay schedules to implement the new residential...
Amendment VC267 implements new residential development planning assessment provisions to boost housing construction to meet the housing needs of Victorians.
The amendment extends the timeframe for the temporary planning provisions that allow for the use and development of land for a Dependent persons unit (DPU) by one year to 28 March 2026.
Amendment VC274 introduces the Precinct Zone (PRZ) at Clause 37.10 to support housing and economic growth in priority precincts across Victoria in line with Victorias Housing Statement, The Decade Ahead 2024-2034 and...
Amendment VC257 makes changes to the Victoria Planning Provisions (VPP) and all planning schemes to introduce Clause 32.10 Housing Choice and Transport Zone (HCTZ) and Clause 43.06 Built Form Overlay (BFO) to support...
The Amendment changes the VPP and all planning schemes in Victoria by introducing a permit exemption for a remote sellers packaged liquor licence under Clause 52.27, replacing references to EPAs Recommended Separation...
Amendment VC273 makes changes to clause 52.20 to apply to housing development that are wholly or partly funded by the Victorian or Commonwealth governments.
The Amendment makes changes to state policy relating to special water supply catchments and water quality, as well as improving references to the Catchment and Land Protection Act 1994 and updating references to policy...
Amendment VC270 extends the outdoor dining planning exemptions under clause 52.18 (Coronavirus (COVID 19) pandemic and recovery exemptions) for a further 12 months.
Amendment VC262 exempts applications to remove, destroy or lop vegetation that comply if a fire prevention notice has been issued under the Fire Rescue Victoria Act 1958.
Amendment VC255 changes the VPP and 52 planning schemes in Victoria by correcting obvious or technical errors and by making consequential changes to local schedules to align with Amendment VC243 and Amendment VC253.
Amendment VC252 changes the VPP and 64 planning schemes in Victoria by correcting obvious or technical errors and by making consequential changes to local schedules to align with Amendment VC243 and Amendment VC253.
The amendment expands the operation of the existing Development Facilitation Program (DFP) planning provisions that fast-track the assessment of significant economic development by enabling an application for renewable...
The amendment changes the VPP and all planning schemes in Victoria by extending the transitional arrangements for a dependent persons unit for a period of 12 months.
The amendment makes changes the Victoria Planning Provisions and all planning schemes related to Birrarung-Bolin Framework Plan, Proof of continuous use, signs in the Transport Zone and State projects.
The amendment changes the Victoria Planning Provisions and all planning schemes in Victoria by exempting development for a small second dwelling from Development Contributions Plan requirements and correcting...
The amendment supports Victorias Gas Substitution Roadmap (Victorian Government, 2022) by prohibiting new gas connections for new dwellings, apartments and residential subdivisions where a planning permit is required.
Amendment VC253 introduces a new land use term and siting, design and amenity requirements for a small second dwelling into the Victoria Planning Provisions (VPP) and all planning schemes to implement Victorias Housing...
The amendment removes prohibitions for specified sign types for a Freeway service centre, Service station and Open sports ground in a zone where Category 4 - Sensitive areas sign controls apply.
Amendment VC247 extends planning exemptions under clauses 52.07 (Emergency recovery) and 52.18 (Coronavirus (COVID 19) pandemic and recovery exemptions) and makes corrections to ordinance introduced in VC246 related to...
Amendment VC246 introduces new land use controls in the Victoria Planning Provisions and all planning schemes to improve facilitation of Victorias Container Deposit Scheme.
Amendment VC243 makes changes the Victoria Planning Provisions (VPP) and all planning schemes to codify residential development standards, implement the Future Homes project across Victoria, remove permit requirements...
Amendment VC242 makes changes to the Victoria Planning Provisions (VPP) and all planning schemes by introducing two new particular provisions to facilitate significant residential development and significant economic...
The amendment supports renewable hydrogen gas production and distribution and makes the Minister for Planning the responsible authority for large-scale production of hydrogen gas.
Amendment VC238 changes the Victoria Planning Provisions and all planning schemes by amending clause 52.13, Victorias container deposit scheme.
Amendment VC231 amends existing planning permit exemption thresholds for dwelling extensions, out-buildings and buildings used for agriculture in clauses 35.03 (Rural Living Zone), 35.07 (Farming Zone) and 35.08 (Rural...
The amendment makes changes to the Victoria Planning Provisions and all planning schemes to correct obvious or technical errors and ensure they are current.
The amendment implements the Melbourne Industrial and Land Use Plan (MICLUP) (Department of Environment, Land, Water and Planning, 2020) in the Planning Policy Framework.
The amendment updates the Planning Policy Framework, introduces two new regional policies and a series of new Significant Landscape Overlays to recognise, protect and improve waterway health, amenity, access and...
Amendment VC228 makes changes to the Victoria Planning Provisions and all planning schemes to facilitate Victorias recovery from emergencies by allowing an exemption from operation hours for extractive industries.
Amendment VC227 makes changes to the Victoria Planning Provisions (VPP) and all planning schemes to support the facilitation of container deposit scheme (CDS) infrastructure under the Victorian Governments, Recycling...
Amendment VC226 makes changes to the Victoria Planning Provisions (VPP) and all planning schemes to support emergency recovery, telecommunications, solar energy systems and community care accommodation.
Amends the Victoria Planning Provisions and all planning schemes that relate to declared irrigation districts and solar energy facilities, delivery exemptions, electorate offices, Future Homes, healthy waterways, land...
Amendment VC222 makes changes to the Victoria Planning Provisions and all planning schemes to support the co-location of new government primary schools with kindergartens and facilitate projects that support the 2026...
The Amendment changes the VPP and all planning schemes in Victoria by: making changes to correct obvious or technical errors and ensure they are current.
Amends clause 73.01 (General terms) of the VPP and all planning schemes to define Minister for Planning to mean a Minister for the time being administering the P&E Act.
The amendment facilitates all-electric developments to support implementation of Victorias Climate Change Strategy 2021 (Strategy) and Gas Substitution Roadmap 2022 (Roadmap).
Revises clauses 52.20 and 72.01 to make the Minister for Planning the responsible authority for relevant applications to reflect the General Order dated 27 June 2022.
Amendment VC213 makes changes to the Victoria Planning Provisions (VPP) and all planning schemes to ensure consistency with existing requirements under the Melbourne Strategic Assessment (MSA) Program to achieve...
Amendment VC216 makes changes to the Planning Policy Framework (PPF) in the Victoria Planning Provisions (VPP) and all planning schemes to support Environmentally Sustainable Development (ESD).
The amendment supports the efficient delivery of neighbourhood batteries into the electricity distribution network by amending clause 73.03 Land use terms of the Victoria Planning Provisions (VPP) and all planning...
Amendment VC210 makes changes to the Victoria Planning Provisions (VPP) and all planning schemes to ensure they are current and correct obvious or technical errors.
The Amendment changes the VPP and all planning schemes in Victoria to support the ongoing operation of extractive industry across Victoria and increase amenity protections for nearby accommodation.
Amendment VC209 facilitates the end of the Secondary Dwelling Pilot Program by deleting clause 51.06 (Secondary dwelling) from the Victoria Planning Provisions and the Greater Bendigo, Kingston, Moreland and Murrindindi...
The amendment introduces exemptions for projects carried out by or on behalf of the Head, Transport for Victoria, and makes the Minister for Planning the responsible authority for planning permit applications made by or...
The amendment introduces a new Transport Zone to replace the Road Zone and Public Use Zone Schedule 4.
Amendment VC174 implements the recently announced revised Better Apartment Design Standards, which delivers improved external amenity and design outcomes for all apartment developments.
The amendment modifies Clause 18 of the Victoria Planning Provisions to implement changes to State planning policy for transport and makes associated changes.
Amendment VC173 updates the land affected by the Melbourne Airport Environs Overlay in the Brimbank, Hume, Melton, Moreland, Moonee Valley and Whittlesea municipalities consistent with the Melbourne Airport Master Plan...
The amendment makes changes to Clause 35.07 (Farming Zone) and to Clause 66.05 (Notice of permit applications under State standard provisions) to support the ongoing operation of wind energy facilities and amenity...
VC202 introduces a definition for 'Rural worker accommodation' in clauses 73.03 (Land Use Terms) and 73.04 (Nesting Diagrams), and permit requirements to facilitate this type of accommodation in the Farming Zone (FZ).
Amendment VC211 updates the notice requirements at clause 67.02 of the Victoria Planning Provisions and all planning schemes.
Amendment VC171 changes the Victoria Planning Provisions to strengthen coastal hazard planning, implements the Marine and Coastal Policy 2020 and makes minor administrative updates.
Amendment VC196 reforms the Victorian planning system by introducing new zone and overlay controls to provide stronger recognition and protection to existing extractive industries, and to designate land with...
The amendment changes the Victoria Planning Provisions and all planning schemes by updating the reference to the Alpine Resorts Strategic Plan 2020-2025 at Clause 12.04-1S Sustainable development in alpine areas.
The amendment introduces new particular provisions at clauses 52.35 (Major Road Projects) and 52.36 (Rail Projects) and makes other changes related to delivery of projects carried out by or on behalf of Major Road...
VC185 amends the VPP and all planning schemes to include the Macedon Ranges Statement of Planning Policy, include exemptions for the Great Ocean Road Coast and Parks Authority as a public land manager and a transitional...
The amendment removes expiry dates and updates existing Design and Development Overlay (DDO) and Significant Landscape Overlay (SLO) schedules within the Yarra River corridor.
Amendment VC195 changes the Victoria Planning Provisions and all planning schemes by modifying the particular provision at clause 52.32 (Wind energy facilities) to streamline the application process for minor changes to...
Introduces a new particular provision, Victorias Big Housing Build at clause 52.20 of the Victoria Planning Provisions and all planning schemes.
Introduces a new particular provision, Housing by or on behalf of the Director of Housing at clause 53.20 of the Victoria Planning Provisions and all planning schemes to streamline the planning permit process to...
amend the Victoria Planning Provisions (clause 72.01-1) to make the Minister the responsible authority for all large energy generation facilities and utility installations,.
The amendment amends clause 52.18 (State of emergency exemption) to support Victorias social and economic recovery from the coronavirus (COVID-19) pandemic through temporary planning scheme and permit condition...
Amendment VC169 changes the Planning Policy Framework to help direct balanced outcomes for housing growth and built form, while also clarifying and consolidating housing policy.
The amendment introduces a new state planning policy Clause 13.07-3S (Live Music) and makes changes to Clause 53.06 (Live Music Entertainment Venues) of the Victoria Planning Provisions (VPP) and all planning schemes to...
Amends Clause 52.12 (Bushfire Protection: Exemptions) to align the 10/30 and fence line vegetation exemptions with the Bushfire Prone Area map across all Victorian councils, make administrative updates and further...
Improves the way the planning system addresses buffers for amenity, human health and safety impacts by updating the Planning Policy Framework (PPF) and Clause 53.10.
The amended inserts a new provision at Clause 52.10 to facilitate rebuilding following the 2019/20 bushfires and amends the Schedule to Clause 72.01 in all planning schemes to designate the CEO as the responsible...
The Amendment changes the Victoria Planning Provisions (VPP) and all planning schemes by amending Clause 52.13-7 (2009 Bushfire - Recovery Exemptions) to extend the expiry date to 30 June 2020.
The amendment changes the Victoria Planning Provisions and all planning schemes by replacing Clause 52.18 [No content] with a new Clause 52.18 (State of emergency exemption), to facilitate the delivery of food and other...
The amendment changes the Victoria Planning Provisions by introducing regional coal policy for Gippsland at Clause 14.03-1R Resource exploration and extraction – Gippsland Coal Resource, in the Planning Policy...
This amendment updates the Planning Policy Framework and Operational Provisions to reference the Plan Melbourne 2017-2050: Addendum 2019 and introduces a new strategy at Clause 11.01-1R Settlement-Metropolitan Melbourne.
Amendment VC160 amends the Victoria Planning Provisions (VPP) and all planning schemes to correct errors and omissions, clarify the operation of certain provisions, and implement planning reforms for extractive...
Amendment VC165 amends the Victoria Planning Provisions and all planning schemes to introduce notice and review exemptions and to amend the responsible authority status for certain planning applications for...
Amendment VC158 amends the Victoria Planning Provisions and all planning schemes to introduce planning exemptions for combustible cladding rectification.
The Amendment changes the Victoria Planning Provisions (VPP) and all planning schemes by amending Clause 52.13-7 (2009 Bushfire – Recovery Exemptions) to extend the expiry date to 31 March 2020.
Amend the Victoria Planning Provisions to introduce new land use terms, revise the definition of land use terms and change where land use terms are nested.
Amends the Victoria Planning Provisions to require planning approval for power lines to connect new large-scale electricity generation facilities to the electricity network
Amend the Planning Policy Framework in Clause 15.03 Heritage to introduce a new strategy to consider restoration or reconstruction of a heritage building unlawfully or unintentionally demolished and a policy guideline...
The amendment delivers on commitments of the Victorian Governments housing strategy Homes for Victorians (2017) through the introduction of permit exemptions for community care accommodation to enable the streamlined...
The Amendment changes the Victoria Planning Provisions (VPP) and all planning schemes by amending Clause 52.13 (2009 Bushfire - Recovery Exemptions) to extend the expiry date to 30 September 2019.
Amends the Victoria Planning Provisions by introducing the Commercial 3 Zone.
Introduces clear land use definitions and risk-based planning controls for animal industries, removes the Piggeries Code of Practice 1992 as an incorporated document, and references the 2018 amendments to the Victorian...
Enables the online publishing of planning schemes through the Department of Environment, Land, Water and Planning's new Amendment Tracking System (ATS).
The amendment corrects an obvious error in the incorporated document Principal Public Transport Network Area Maps (State Government of Victoria, 2018).
The amendment introduces changes to the Victoria Planning Provisions (VPP) and all planning schemes arising from the Victorian Government’s Smart Planning program.
The Amendment changes the Victoria Planning Provisions (VPP) and all planning schemes by: - Amending the State Planning Policy Framework at Clause 19 and 19.03 to remove references to development contributions and...
The Amendment changes the Victoria Planning Provisions (VPP) and all planning schemes by: - Amending the State Planning Policy Framework at Clause 11.05-2 to include the Yarra Ranges Localised Planning Statement. -...
The Amendment changes the Victoria Planning Provisionsand all planning schemes by: Amending Clause 52.05 (Advertising signs) to: specify electronic sign in Section 2 of Category 3 - High amenity areas (Clause 52.05-9)...
The Amendment includes a wide range of reforms across the VPP that generally remove permit triggers, expand permit exemptions for land uses and buildings and works, remove superfluous and outdated provisions, update...
The Amendment changes the VPP and all planning schemes in Victoria by: Inserting an updated State Planning Policy Framework at Clause 10 Operation of the State Planning Policy Framework.
The Amendment changes the Victoria Planning Provisions (VPP) and all planning schemes by: Amending Clause 19.01-1 - updating policy guidelines to the revised document Policy and Planning Guidelines for Development of...
Amendment VC132 is a general amendment that makes a number of administrative corrections and other changes to the Victoria Planning Provisions (VPP) and all planning schemes in Victoria.
Introduces new planning requirements for racing dog facilities and inserts new reference documents for urban design guidelines and apartment design guidelines
The Amendment Planning Scheme Information Management System (PSIMS) to imprcorrects inconsistencies and improves the structure of planning schemes to enable their migration into the ove access to, and more efficient...
The Amendment changes the Victoria Planning Provisions and all planning schemes in Victoria by introducing the new Metropolitan Planning Strategy and making corresponding updates to the State Planning Policy Framework.
The amendment introduces additional classes of application into the VicSmart provisions, and increases the cost of development threshold of some existing VicSmart buildings and works classes of application.
Implements the governments response to the recommendations of the Managing Residential Development Advisory Committee by amending Clause 72 to introduce a new general term, garden area and amending the Neighbourhood...
The amendment changes the Victoria Planning Provisions and all planning schemes by amending Clause 52.19 - Telecommunications facility, to exempt a permit application for a telecommunications facility funded (or partly...