Development Plan Overlay (Clause 43.04) in Greater Geelong

PolicyPing Research

Last checked 7 July 2026

The Development Plan Overlay (DPO) is used across Victoria to identify areas where the form and conditions of future use and development must be shown on a development plan before a permit can generally be granted to use or develop the land. Greater Geelong applies the overlay through 40 separate local schedules, reflecting its large number of structure-plan-guided growth-area precincts.

This describes what Greater Geelong's planning scheme generally states, as last checked by PolicyPing. It isn't a site-specific assessment or a substitute for advice from a licensed practitioner. For your specific address, see ReefReport. Read the full methodology.

What Clause 43.04 generally requires

Shown on the planning scheme map as DPO with a number.

Purpose

To implement the Municipal Planning Strategy and the Planning Policy Framework.

To identify areas which require the form and conditions of future use and development to be shown on a development plan before a permit can be granted to use or develop the land.

To exempt an application from notice and review if a development plan has been prepared to the satisfaction of the responsible authority.

How Greater Geelong's scheme varies this

Of the 40 DPO schedules, 24 name a specific category of work the responsible authority may approve before an approved development plan exists (for example a single dwelling on an existing lot, or works consistent with an existing permit), 6 apply a general discretionary test instead (a permit may be granted early only if the responsible authority is satisfied it won't prejudice the area's future development), and 1 state that no permit is required under the overlay at all; the rest set no differing pre-development-plan requirement, or use other wording not captured by these three categories. Which category applies, and exactly what it allows, depends entirely on the individual DPO schedule covering the land.

Where this applies

This applies only to land shown with a Development Plan Overlay (DPO) on the Greater Geelong planning scheme map — that is, land covered by one of the 40 individual schedules above. Which schedule applies, and what it specifically allows or requires, depends on the exact location.

Frequently asked questions

How many Development Plan Overlay schedules does Greater Geelong have?

Greater Geelong's planning scheme currently has 40 local schedules to Clause 43.04, each covering a different precinct or site.

Can I get a permit before a development plan is approved?

This depends on the specific DPO schedule covering the land. 24 of 40 of Greater Geelong's schedules name a specific allowed category of work (for example a single dwelling on an existing lot) — the largest single group — while the remainder set a general discretionary test, no requirement at all, or state that no permit is required under the overlay. Check the specific schedule, or use ReefReport for a site-specific check.

What is the Development Plan Overlay generally used for?

Under the Victoria Planning Provisions, the Development Plan Overlay is generally used to identify areas that require the form and conditions of future use and development to be shown on a development plan before a permit can be granted, and to exempt an application from notice and review once a satisfactory development plan is in place.